Re: macro doubt
Posted by L14 on Mar 12, 2014; 8:29am
URL: http://discussion-forum.276.s1.nabble.com/macro-doubt-tp7585168p7585188.html
@raj: i'm not 100% sure. I think you are right . If A is included in Price setting, it should be included in Wage setting too, in that case both will get cancelled and the answer will be Yn=A*[1-exp[-1/z(1+µ)]] which is none of the above.
@sonia: can u confirm the answer