Re: JNU 2012 SSS DOUBTS
Posted by Arushi :)) on Apr 21, 2014; 9:18am
URL: http://discussion-forum.276.s1.nabble.com/JNU-2012-SSS-DOUBTS-tp7587457p7587520.html
55.
Whatever is the initial size, let it be x,
Then on the first day size is x
On the second day it doubles in size 2x
on the third day size is 4x = (2^2)*x
on the fourth day size 8x= (2^3) *x
.
.
.
.
.
On the 48th day size would (2^47)*x
So the total size is (2^47)*x
Half of this size is (2^47)*x/2 = (2^46)*x
This size is covered on the previous day , i.e 47th day.
So it takes 47 days to cover half the lake.
It is d therefore